Tools for the Project Manager
Knowledge Article | Project Classification | |||
Capital Improvement Projects | Safety Projects | Asset Management Projects | Maintenance Projects | |
1.0 Tools and Resources for the Project Manager | x | x | x | x |
2.0 List of Tools and Resources | x | x | x | x |
3.0 Associated Articles | x | x | x | x |
4.0 Reference Documentation | x | x | x | x |
x = Information from the topic may be applicable for the project classification. |
Many tools and resources are available to help KYTC Project Managers (PMs) manage projects. Some (e.g., communication tools) are used throughout a project’s life cycle while the use of others (e.g., Pavement Design Web Application) is confined to one project phase. Tools and resources are available to facilitate the following project functions:
- Track project schedule (project progress) and budgets
- Communicate with project team members and the public
- Document project decisions and commitments
- Identify project needs
- Assist in project design and decision making
- Manage consultant contracts and payments
- Reduce project risk
The PMGB article Project Manager Training provides information on training available for some of these tools.
Table 1 lists project management tools and resources KYTC PMs use most often. If a tool or resource is accessible on the web, a link is provided. Links to associated PMGB or Highway Knowledge Portal articles are also included. These pieces offer more context on the application of tools and resources.
Table 1: Project Manager Tools and Resources Project Management | ||||||||||||
Project Management | ||||||||||||
Tool Name | Program | Tool Location | Phase of Project | Use | Manual Location | Highway Knowledge Portal Article | ||||||
Project Managers Toolbox | Web-based | Project Manager's Toolbox | Throughout Project Life |
|
PM Toolbox Manual | |||||||
Program Delivery Platform (PDP) | Web-based | Program Delivery Platform | Throughout Project Life |
|
N/A | PMGB: Document Management, Storage, and Archival | ||||||
ProjectWise | ProjectWise | ProjectWise Request Form | Throughout Project Life |
|
KYTC CADD Standard Policy | PMGB: Document Management, Storage, and Archival | ||||||
Microsoft Outlook | MS Outlook | Assigned Computer | Throughout Project Life |
|
Guides and Cheat Sheets | PMGB: Document Management, Storage, and Archival | ||||||
Microsoft Teams | MS Teams | Assigned Computer | Throughout Project Life |
|
Guides and Cheat Sheets | |||||||
Microsoft OneDrive | MS OneDrive | Cloud Based | Throughout Project Life |
|
Guides and Cheat Sheets | PMGB: Document Management, Storage, and Archival | ||||||
Highway Design Forms | MS Word and Excel | Highway Design Forms Library | Throughout Project Life |
|
||||||||
KYTC Policy Manual Library | Policy Manual Library | Throughout Project Life |
|
N/A | ||||||||
Risk-Based Project Development Tool | MS Excel | Risk Analysis Tool | Throughout Project Life |
|
Risk-Based Project Development Research Report | PMGB: Managing Project Risk | ||||||
FHWA Risk Management Register | MS Excel | Risk Management Register | Throughout Project Life |
|
N/A | PMGB: Managing Project Risk | ||||||
Highway Knowledge Portal | Web-based | Highway Knowledge Portal | Throughout Project Life |
|
N/A |
Table 1 cont. : Project Manager Tools and Resources Consultant Contract Administration | ||||||||||||
Tool Name | Program | Tool Location | Phase of Project | Use | Manual Location | Highway Knowledge Portal Article | ||||||
Professional Services Portal | Web-based | Professional Services Portal | Throughout Project Life |
|
Professional Services Portal User Guide | HKP: Managing Consultant Contracts | ||||||
Professional Service Forms | MS Word and Excel | Professional Services Forms Library | Throughout Project Life |
|
N/A | HKP: Managing Consultant Contracts | ||||||
Pre-Design Conference Minutes (File download) | MS Word | Pre-Design Conference Minutes | Project Scoping |
|
HD-205.4 | HKP: Managing Consultant Contracts | ||||||
Consultant Evaluations | SharePoint | Consultant Evaluations | Preliminary Engineering, Final Design, Letting |
|
HD-205.9 | HKP: Managing Consultant Contracts |
Table 1 cont. : Project Manager Tools and Resources Project Initiation | ||||||||||||
Tool Name | Program | Tool Location | Phase of Project | Use | Manual Location | Highway Knowledge Portal Article | ||||||
Work Breakdown Structures | MS Project or PDF | Critical Path Project Templates | Throughout Project Life |
|
N/A | HKP: Project Time Management | ||||||
Planning Studies and Reports | Planning Studies and Reports | Initiation and Preliminary Engineering |
|
HD-202.3.1 | PMGB: PM and Planning | |||||||
Data Needs Analysis Studies | Data Needs and Analysis Reports | Initiation and Preliminary Engineering |
|
N/A | PMGB: PM and Planning | |||||||
Gantt Chart | MS Project or similar program | Assigned Computer | Throughout Project Life |
|
N/A | HKP: Project Time Management | ||||||
Continuous Highway Analysis Framework (CHAF) | Web-based | CHAF | Project initiation |
|
HD-202.1 | PMGB: Project Identification | ||||||
Highway Plan | Web-based | Program Management | Project Initiation |
|
HD-202.1 | PMGB: Project Identification | ||||||
Highway Information View and Extract Interface (HIVEi) | Web-based | HIVEi | Project Initiation |
|
HD-202.3.4 | PMGB: PM and Planning | ||||||
PMGB: Project Initiation | ||||||||||||
KYTC Traffic Count Reporting System | Web-based | Traffic Counting Reporting System | Project Initiation |
|
HD-202.3.3 | PMGB: PM and Planning | ||||||
PMGB: Project Initiation | ||||||||||||
Highway Information System (HIS) | Web-based, ESRI ArcGIS | Highway Information System | Project Initiation and Preliminary Engineering |
|
HD-202.3 | PMGB: Project Initiation | ||||||
KYTC Mapping | Web-based and PDF | Maps/Resources | Throughout Project Life |
|
HD-211.3 | PMGB: Project Initiation | ||||||
Crash Data Analysis Tool (CDAT) | Web-based | CDAT | Project Initiation and Preliminary Engineering |
|
HD-202.3.4 | PMGB: Project Initiation | ||||||
Kentucky State Police Collision Data | Web-based | KSP Collision Data | Project Initiation and Preliminary Engineering |
|
HD-202.3.4 | PMGB: Project Initiation | ||||||
Google Earth | Web-based | Google Earth | Throughout Project Life |
|
N/A | |||||||
KYTC Public Involvement Toolbox | Web-based | Public Involvement Toolbox | Preliminary Engineering |
|
N/A | PMBG: Public Involvement |
Table 1 cont. : Project Manager Tools and Resources Preliminary Engineering | ||||||||||||
Tool Name | Program | Tool Location | Phase of Project | Use | Manual Location | Highway Knowledge Portal Article | ||||||
Design Executive Summary Form (File download) | MS Excel | Design Executive Summary | Preliminary Engineering |
|
HD-203.6 | PMGB: PM and Preliminary Design | ||||||
Estimator | Estimator Program | KYTC Estimator Page | Preliminary Engineering, Final Design, Letting |
|
N/A | |||||||
KYTC Geotechnical Investigations | Web-based | KYTC Geotechnical Data | Project Initiation |
|
HD-202.3.8 | PMGB: PM and Preliminary Design | ||||||
Archive Plans | Web-based mapping | Project Plan Archives | Preliminary Engineering |
|
HD-202.3.2 | PMGB: Project Initiation | ||||||
KYFromAbove | GIS Image mapping | KYFromAbove | Preliminary Engineering |
|
HD-202.3.5 | PMGB: Project Initiation | ||||||
FEMA Flood Map Service Center | Web-based, PDF | FEMA | Preliminary Engineering |
|
HD-202.3.5 | PMGB: Project Initiation | ||||||
Kentucky Water Resource Info System | Web-based mapping | Kentucky Infrastructure Authority | Preliminary Engineering |
|
N/A | PMGB: Project Initiation | ||||||
Communicating All Promises (CAP) | Web-based in PDP | Program Delivery Platform | Preliminary Engineering and Final Design |
|
HD-203.4 | PMGB: Project Management and NEPA | ||||||
Environmental Assessment Tracking System (EATS) | Web-based | Intranet (KYTC Access Only) | Preliminary Engineering and Final Design |
|
N/A | PMGB: Project Management and NEPA | ||||||
CE Checklist and Matrix | CE Matrix | Preliminary Engineering |
|
N/A | PMGB: Project Management and NEPA | |||||||
Kentucky Utility and Rail Tracking System (KURTS) | Web-based | KURTS | Preliminary and Final Design |
|
UR-301 | PMGB: PM and Utility Coordination | ||||||
KROWDS/RWUMS | Web-based | Intranet | Preliminary and Final Design |
|
N/A | |||||||
SAFERoad Solutions | Web-based | SAFERoad Solutions | Preliminary Design |
|
N/A | HKP: Intersection Control Evaluation | ||||||
Complete Streets Program | Web-based PDF | Complete Streets | Preliminary Design |
|
Complete Streets Manual |
Table 1 cont. : Project Manager Tools and Resources Final Design | ||||||||||||
Tool Name | Program | Tool Location | Phase of Project | Use | Manual Location | Highway Knowledge Portal Article | ||||||
Pavement Design Web Application | Web-based | KYTC Pavement Design | Final Design |
|
HD-1001.1 | PMGB: PM and Final Design | ||||||
Standard Drawings | Web-based PDF | KYTC Standard Drawings | Final Design |
|
N/A | |||||||
Standard Specifications for Road and Bridge Construction | Web-based PDF | KYTC Standard Specifications for Road and Bridge Construction | Final Design |
|
N/A | |||||||
Drainage Resource Materials | Web-based | KYTC Drainage Resources | Final Design |
|
Drainage Manual | PMGB: PM and Final Design | ||||||
Traffic Management Plan (File download) | MS Word | Traffic Management Plan | Final Design |
|
HD-206.3 | |||||||
Final Plan Submittal Form (File download) | MS Excel | KYTC Final Plan Submittal Form | Final Design |
|
HD-209.1 | PMGB: Preparing for Letting | ||||||
Project Development Checklist (File download) | Project Development Checklist | Final Design |
|
HD-209.3 | PMGB: Preparing for Letting |
HKP: Managing Consultant Contracts
HKP: Intersection Control Evaluation
PMGB: Document Management, Storage, and Archival
PMGB: Managing Project Risk
PMGB: Project Management & Planning
PMGB: Project Identification
PMGB: Project Initiation
PMGB: Public Involvement with Customers and Stakeholders
PMGB: Project Management & Preliminary Design
PMGB: Project Management & NEPA
PMGB: Project Management & Utility Coordination
PMGB: Project Management & Final Design
PMGB: Preparing for Letting
Project Management Guidebook Knowledge Book:
Access the complete Knowledge Book here: Project Management Guidebook